Five services, one job: get the route ready for the FAA.
Each service has a fixed scope, a list of what it leaves out and a fixed price. Order one, or run them in sequence from desk review to monthly monitoring.
01 Route feasibility assessment
A desk review tells you which routes are worth surveying.
You give us takeoff points and destinations. We check every candidate route against the data the FAA and local airspace users care about, and rank them.
Price
$850 per route; $700 per route from the third route
Typical timeline
5 business days for up to 5 routes
Includes
- Overlay of FAA UAS Facility Maps grid ceilings and airspace class along each route
- Airports, heliports and hospital helipads within range of the route
- Active and recurring TFR areas
- Population density and terrain along the corridor
- A go / conditional / no-go call per route, with the reason
Not included
- Site visits or obstacle measurement (see field survey)
- Filing with the FAA
Deliverables
- PDF assessment report
- KML and GeoJSON route files, each route tagged with airspace class and restrictions
02 Field route survey
Field data goes into the waiver, not map estimates.
Our surveyor travels the route and records what public maps miss or get wrong, then checks each takeoff and landing site in person.
Price
From $3,400 per project (1 route up to 5 mi, 2 sites); +$600 per extra site, +$350 per extra route mile. Travel outside Stanislaus, Merced, San Joaquin and Fresno counties billed at cost.
Typical timeline
2–3 weeks from site access
Includes
- Obstacle inventory: power lines, communication towers, tall trees and buildings, each with height and coordinates
- Takeoff and landing site clearance, ground foot traffic and emergency landing spots
- Radio signal testing along the route and at each site
Not included
- Flight testing with your aircraft
- Surveys outside California
Deliverables
- Obstacle log with photos
- Route altitude profile
- Takeoff and landing site layout drawings
Route R-02 · obstacle log (sample)
| Obstacle | Height AGL | Clearance |
|---|---|---|
| Transmission line span Mile 1.8 | 112 ft | Below route |
| Cell tower Mile 2.4 | 164 ft | Lateral 0.3 mi |
| Eucalyptus windbreak Mile 3.1 | 88 ft | Below route |
| Grain elevator Site B approach | 131 ft | Re-route |
04 Operations manual and route documentation
Your crew gets route procedures they can run on a checklist.
We write or revise the route-specific sections of your operator's standard operating procedures, working with your chief pilot or operations lead.
Price
$2,900 per project, up to 5 routes
Typical timeline
2–3 weeks
Includes
- Route list with altitudes, sites and alternates
- Weather launch limits per route
- Lost-link return and emergency procedures
- Coordination contact sheet for nearby airports and hospital helipad operators
Not included
- Company-wide safety management systems
- Aircraft maintenance programs
- Pilot training
Deliverables
- Route SOP sections in Word and PDF
- Contact sheet
- Updated route files
05 Monitoring and airspace coordination
Your pilots keep flying. We keep the route current.
A monthly subscription for routes already in operation, priced by how many routes you have on file.
Includes
- NOTAM and TFR check before each day's flight window, with an alert if a route is affected
- Route file updates when new obstacles or construction appear along a route
- Renewal of authorizations before they expire, started 30 days ahead
- Day-to-day contact with nearby airport and heliport operators
Not included
- Flight dispatch or live flight following
- New waiver applications (quoted separately)
- NOTAM/TFR check complete for 6 routes; no conflicts 06:40
- Crane NOTAM posted 0.4 mi from Route R-04; route file updated with temporary offset 06:52
- Heliport operator notified of revised R-04 track 07:15
- Authorization for R-01 expires in 30 days; renewal drafted Yesterday
A project moves from inquiry to delivery in three steps.
- 01
Inquiry
Email your sites, aircraft model and start date. We reply within one business day.
- 02
Proposal
You receive a written scope with routes, services, deliverables, dates and a fixed price.
- 03
Delivery
Reports, route files and filings arrive on the agreed dates; FAA questions are answered as they come in.