Six facts about your program decide most of the assessment.
A feasibility assessment is only as good as the inputs. Programs that arrive with these six items get a usable answer in one pass; programs that don't usually lose a week to back-and-forth.
1. Exact takeoff and destination points
Street addresses are a start, but coordinates for the actual pad are better. A rooftop pad and a parking-lot pad at the same address can sit on opposite sides of a UAS Facility Map grid line, with different altitude ceilings.
2. The aircraft you plan to fly
Give us the make and model, maximum takeoff weight with payload, cruise speed, endurance and what it does on lost link. These numbers set the route length you can support and shape the risk analysis later.
3. Payload and frequency
Ten flights a day carrying lab specimens is a different filing from two flights a week with a tractor part. Frequency and time of day change the population exposure along the route.
4. Who the operator is
Tell us whose remote pilots will fly and who holds, or will hold, the operating authority. We prepare filings for the operator; we never hold them ourselves.
5. Site owners and neighbors
Name a contact for each pad's property, plus any hospital helipad, airport or private airstrip you know is nearby. Early contact prevents late surprises.
6. Your target first-flight date
If the route needs a waiver, the FAA's review time sits on the critical path and is outside anyone's control but the FAA's. A realistic date lets us tell you early whether to start with a shorter route that needs only an authorization.
Send what you have, even if it's incomplete. Gaps in the list become questions in our first reply.